Panorama of joint workshop of Chongqing Sanlei glass project (phase I) in construction (June 3, 2017)
Panorama photo of warp knitting workshop of Chongqing Sanlei glass fiber project under construction (June 3, 2017), sandalwood installation completed 60%.
Chongqing Sanlei glassfiber construction project -- nearly completed R & D building (June 3, 2017)
The staff dormitory (June 3, 2017), a glass fiber construction project in Sanlei, Chongqing, has basically been equipped with accommodation conditions, and some employees have already checked in. Outdoor ancillary works completed 50%
Chongqing Sanlei glass fiber project -- finished product storehouse in construction (China Metallurgical Construction)
Chongqing Sanlei Glass Fiber Construction Project - Construction Photo of Finished Product Storehouse Welding Embedded Parts (June 3, 2017) (China Smelter Construction)
Chongqing three Lei glass fiber construction project is installing the network inspection workshop.
Construction of Chongqing Sanlei Glass Fiber Project - Yarn Garage Panorama (July 3, 2017) Now Roof Sandalwood Installation Completed
Chongqing SanLei glass fiber glass project -- partial scene of kiln section
Welding construction of steel structure in Chongqing three Lei glass fiber project
Chongqing three Lei glass fiber project -- two layers of wire drawing area
Chongqing SanLei glass fiber project -- drawing room section
The three largest glass fiber project in Chongqing -- drawing section
Chongqing SanLei glass fiber project - kiln section 1-5 axis A~T roof color steel plate has been installed.
Chongqing SanLei glass fiber project -- the upper wire drawing area of the drawing section
Chongqing SanLei glass fiber project - pool kiln
Chongqing SanLei glassfiber project -- the 1A~T shaft of the pool kiln and the 6~12 steel grid are installed 30%
Chongqing Sanlei Glass Fiber Project - Raw material workshop frame completed 12 meters, 16 meters platform is carrying out steel bar binding operation.
Chongqing three Lei glassfiber project - workers working for oil painting of steel parts (Henan installation)
Chongqing Sanlei Glass Fiber Project - 110 Substation is completed, but the overall time delay, the picture is installed truss 110 substation main transformer room
Chongqing Sanlei Glass Fiber Project - pouring water tower: the first water tower is pouring tank construction (right), the second water tower cylinder has been poured to 15 meters.
Henan installation company staff seriously work scene